Project Details
Contractor
Land Lease Engineering Pty Ltd
Client
Department of Transport and Main Roads
Engineer
Geoinventions Consulting Services
Location
Gateway Motorway between Nudgee and Bracken Ridge, South East, Queensland
Project Information
The Gateway Upgrade North project involves upgrading 11.3km of the Gateway Motorway to six lanes between Nudgee and Bracken Ridge. The project will deliver important safety and efficiency improvements for the 83,000 vehicles that travel on the motorway each day.
The project is jointly funded by the Australian and Queensland Governments and delivery is being managed by the Department of Transport and Main Roads and Transurban Queensland. Lend Lease Engineering Pty Ltd has been appointed to design and construct the project.
Major construction started in early 2016 and is due for completion in 2018.
Design
As part of a comprehensive temporary works package solution for the widening of bridges at Sandgate Road and the Bicentennial Road interchange, Geoinventions Consulting Services designed and stabilised steep slope embankments/abutments of up to 3 metres in height to support the Gateway Motorway. The temporary abutments allowed the construction of a working platform to facilitate the implementation of permanent piling works.
The Platipus Earth Anchoring System was chosen as the solution to stabilise the temporary abutments and comprised of driving Platipus S6 and S8 Stealth Anchor Systems to depths of 3 meters.
The Platipus system provided the following main features and benefits:
- Buildability and ease of installation – effective and efficient temporary works installation with up to 6 anchor systems being installed and tested per hour
- Relatively low noise level and disruption during night time construction
- No sheet pile design, installation or removal was required
- Total (supply and install) cost savings over traditional solutions
Products used in this Project
DuraForce AS series geotextile is manufactured and tested to exact quality standards...
DuraForce® K geotextiles are an extremely robust nonwoven staple fibre geotextile, suitable...
DuraForce® woven geotextile is suited to applications requiring both separation and reinforcement.