Case Studies
Case Studies
Severe flooding along the Hawkesbury River, north of Sydney, caused significant damage to two sections of Greens Road in the Lower Portland Region. Delaney Civil used...
The Orchards is a large block residential development located in Jensen, just north of Townsville. Constructed on sloping terrain, and surrounded by natural bushland, The Orchards...
The Old Jugiong Water Treatment plant in NSW was originally constructed in the 1930s and upgraded in 1991. Further expansion works and an overall upgrade in...
Situated on Queensland’s Sunshine Coast, the Zinc Bokarina complex will offer 84 luxuriously appointed beach front apartments. Stratec Pty Ltd were engaged to supply and install...
Hutchinson Builders (Hutchies) were engaged to build a new site for Pillow Talk in Darra Brisbane, constructing a high-end office and warehouse distribution complex to bring...
This section of State Highway 73, a key arterial route in Canterbury New Zealand, follows the Kowai River through the foothills of the Southern Alps as...
Ozcare have grown significantly over the years and have recently expanded their current Currimundi site adding addition units to the retirement village complex.
In the past this contractor would have typically opted to apply traditional ‘rock rip rap’ on the slopes on either side of the culvert at a...
The Waiāri Water Supply Scheme involved developing a water extraction facility on the Waiāri Stream and an underground water pipeline from the plant to service the...
Right on the eve of the long-awaited opening of State Highway 1 at Kaikoura, Cirtex and the NCTIR team are pleased to present this epic case...
Cirtex Australia alongside Rizzani Leighton Joint Venture worked together in providing a temporary work solution to stabilise the embankment which supported the M4 motorway.
SurePave was chosen for this high-profile development in order to create a free-draining, pothole-free, grassed surface, which was able to withstand heavy turning vehicles.
Earthtec proposed a design and construct alternative using Platipus Anchoring system as a recommended option along with conforming solutions for the sandstone works.
To eliminate the total design, dismantling and replacement of an existing retaining wall, remedial works and stability measure improvements were designed and implemented to a stormwater...
Platipus anchoring systems were used with a geosynthetic permanent erosion control matting and were chosen as a ‘combination solution’ to provide slope stability measures to an...
Remedial and stability measures were designed and implemented to the existing Meyer Road Bridge located in Lonsdale, South Australia.
The project involved providing further stability and erosion control to an existing 12m long x 2m high retaining wall adjacent to a private property on the...
As part of a major state highway upgrade, a 300mm gas pipeline needed to be laid through sandy soils that were prone to a high water...